Revision Library
Choose a subject
Menu
University Admissions
Need a new topic?
Missing a topic, found a bug, or want something added?

UCAT Quantitative Reasoning: Ratio and proportion, set 1

Sharing in a ratio, scaling a recipe or a dose, and telling direct proportion from inverse proportion when the data does not say which. Test standard. 12 questions, 12 marks, about 9 minutes.

Download the questions (PDF) Download with worked solutions (PDF)

  • Most questions come in groups of four that share one table or passage.
  • Each question has exactly one correct answer from five options.
  • A basic calculator is allowed in this subtest.
  1. 11 mark

    A 4-year-old child weighs 14 kg. What volume of the oral liquid should be given as one single dose?

    1. A 2.1 ml
    2. B 8.75 ml
    3. C 10.5 ml
    4. D 11.25 ml
    5. E 31.5 ml
  2. 21 mark

    A 9-year-old weighs 44 kg. What is the total amount of Drug X this child receives in one day when given the full number of doses?

    1. A 200 mg
    2. B 440 mg
    3. C 528 mg
    4. D 600 mg
    5. E 660 mg
  3. 31 mark

    An adult aged 30 who weighs 75 kg is prescribed Drug X tablets at the full daily number of doses. A pack holds 28 tablets. For how many complete days will one pack last?

    1. A 3 days
    2. B 4 days
    3. C 5 days
    4. D 9 days
    5. E 14 days
  4. 41 mark

    A 3-year-old weighing 12 kg and a 7-year-old weighing 24 kg are each given one single dose of Drug X. What is the ratio of the 3-year-old's dose to the 7-year-old's dose, in its simplest form?

    1. A 1 : 2
    2. B 3 : 4
    3. C 3 : 5
    4. D 5 : 3
    5. E 6 : 5
  5. 51 mark

    The bakery receives an order for 30 scones and scales the recipe exactly. How many grams of sultanas are needed?

    1. A 48 g
    2. B 138 g
    3. C 240 g
    4. D 300 g
    5. E 360 g
  6. 61 mark

    Counting only the fraction of each pack that one batch uses, what is the ingredient cost of one scone, to the nearest penny?

    1. A 0.17 GBP
    2. B 0.22 GBP
    3. C 0.32 GBP
    4. D 0.81 GBP
    5. E 2.64 GBP
  7. 71 mark

    The bakery uses exactly 6 kg of flour a week and currently buys it in 1.5 kg bags. How much would it save each week by buying 3 kg sacks instead?

    1. A 0.05 GBP
    2. B 0.30 GBP
    3. C 0.60 GBP
    4. D 0.90 GBP
    5. E 1.05 GBP
  8. 81 mark

    The bakery sells a 1.29 kg bag of dry scone mix containing only flour, caster sugar and sultanas, in the same ratio as the recipe card. How many grams of sultanas are in the bag?

    1. A 120 g
    2. B 150 g
    3. C 240 g
    4. D 430 g
    5. E 900 g
  9. 91 mark

    If the hall had been painted by 6 decorators instead of 4, working at the same rate, how many working days would it have taken?

    1. A 4 days
    2. B 6 days
    3. C 8 days
    4. D 9 days
    5. E 24 days
  10. 101 mark

    How many working days will the corridor take with the number of decorators assigned to it?

    1. A 2 days
    2. B 2.25 days
    3. C 3 days
    4. D 4 days
    5. E 12 days
  11. 111 mark

    How many tins of paint must be bought for the office?

    1. A 3
    2. B 5
    3. C 7
    4. D 8
    5. E 38
  12. 121 mark

    The school asks for the six classrooms to be finished in 4 working days. What is the smallest number of decorators needed to do this?

    1. A 3
    2. B 4
    3. C 6
    4. D 7
    5. E 8

Worked solutions

Each solution below shows the working. The official material for this test gives only the correct option letter.

  1. Question 1

    Answer or workingMarks
    C1
    A 4-year-old is in the 1 to 5 years band, so the dose is 6 mg per kg: 6 x 14 = 84 mg.
    Check the cap: the maximum single dose for this band is 90 mg, and 84 mg is below it, so 84 mg is given.
    The liquid holds 40 mg in 5 ml, which is 40 / 5 = 8 mg in each ml.
    Volume = 84 / 8 = 10.5 ml. The answer is C.
    Why not A: Divides the 84 mg dose by 40 (84 / 40 = 2.1), treating the liquid as 40 mg per ml and forgetting that the 40 mg is in 5 ml.
    Why not B: Uses the 6 to 11 years rate of 5 mg/kg: 5 x 14 = 70 mg, and 70 / 8 = 8.75 ml. A 4-year-old is in the 1 to 5 years band.
    Why not D: Gives the band's maximum single dose of 90 mg (90 / 8 = 11.25 ml) even though the weight-based dose of 84 mg is below the cap.
    Why not E: Works out the whole day's volume, 3 doses x 84 mg = 252 mg and 252 / 8 = 31.5 ml, when the question asks for one dose.
  2. Question 2

    Answer or workingMarks
    D1
    A 9-year-old is in the 6 to 11 years band: 5 mg per kg, maximum single dose 200 mg, 3 doses per day.
    The weight-based dose is 5 x 44 = 220 mg, which is over the 200 mg cap, so each dose is 200 mg.
    Daily total = 3 x 200 = 600 mg.
    The answer is D.
    Why not A: Stops at the single dose of 200 mg and does not multiply by the 3 doses per day.
    Why not B: Uses the uncapped dose of 5 x 44 = 220 mg but takes 2 doses per day from the adult row: 220 x 2 = 440 mg.
    Why not C: Uses the 12 years and over rate of 4 mg/kg with 3 doses: 4 x 44 = 176 mg, and 176 x 3 = 528 mg.
    Why not E: Ignores the maximum single dose: 5 x 44 = 220 mg, and 220 x 3 = 660 mg. Each dose is capped at 200 mg.
  3. Question 3

    Answer or workingMarks
    B1
    An adult aged 30 is in the 12 years and over band: 4 mg per kg, maximum 400 mg, 2 doses per day.
    Single dose = 4 x 75 = 300 mg, which is under the 400 mg cap. At 100 mg per tablet that is 3 tablets per dose.
    Tablets per day = 3 x 2 = 6. The pack gives 28 / 6 = 4.67 days, and only complete days count (4 days use 24 tablets; a fifth day would need 30).
    The answer is B.
    Why not A: Gives the maximum single dose of 400 mg (4 tablets) instead of the weight-based 300 mg: 8 tablets a day, and 28 / 8 = 3.5, so 3 days.
    Why not C: Finds 28 / 6 = 4.67 correctly but rounds up to 5; the fifth day would need 30 tablets, more than the pack holds.
    Why not D: Counts 3 tablets per dose but only one dose per day: 28 / 3 = 9.33, so 9 days. Adults take 2 doses a day.
    Why not E: Treats each dose as a single tablet, so 2 tablets a day and 28 / 2 = 14 days, ignoring the dose size.
  4. Question 4

    Answer or workingMarks
    C1
    The 3-year-old is in the 1 to 5 years band: 6 x 12 = 72 mg, under the 90 mg cap.
    The 7-year-old is in the 6 to 11 years band: 5 x 24 = 120 mg, under the 200 mg cap.
    Ratio 72 : 120. Dividing both by 24 gives 3 : 5.
    The answer is C.
    Why not A: Compares the weights only, 12 : 24 = 1 : 2, as if both children took the same dose per kg.
    Why not B: Puts the 7-year-old in the 12 years and over band: 4 x 24 = 96 mg, and 72 : 96 = 3 : 4.
    Why not D: Finds the right doses, 72 mg and 120 mg, but writes the ratio the wrong way round.
    Why not E: Compares the dose rates per kg (6 : 5) and ignores the children's weights.
  5. Question 5

    Answer or workingMarks
    D1
    The scale factor from 12 scones to 30 scones is 30 / 12 = 2.5.
    Sultanas for one batch = 120 g.
    Sultanas for 30 scones = 120 x 2.5 = 300 g.
    The answer is D.
    Why not A: Inverts the scale factor: 120 x 12 / 30 = 48 g, which makes the larger order use less fruit.
    Why not B: Scales by adding instead of multiplying: 30 - 12 = 18 extra scones, so 120 + 18 = 138 g.
    Why not C: Doubles the recipe (120 x 2 = 240 g), which makes only 24 scones.
    Why not E: Trebles the recipe (120 x 3 = 360 g), which makes 36 scones, rounding the order up to whole batches when the question says scale exactly.
  6. Question 6

    Answer or workingMarks
    B1
    Cost of each ingredient = (amount used / pack size) x pack price. Flour 450/1500 x 1.20 = 0.36; butter 100/250 x 2.10 = 0.84; sugar 75/1000 x 1.60 = 0.12.
    Sultanas 120/500 x 2.00 = 0.48; milk 240/1000 x 1.00 = 0.24; eggs 2/6 x 1.80 = 0.60.
    Batch cost = 0.36 + 0.84 + 0.12 + 0.48 + 0.24 + 0.60 = 2.64 GBP.
    Per scone = 2.64 / 12 = 0.22 GBP. The answer is B.
    Why not A: Leaves out the eggs because they are counted rather than weighed: 2.64 - 0.60 = 2.04 GBP, and 2.04 / 12 = 0.17 GBP.
    Why not C: Charges the whole 1.80 GBP egg box instead of 2/6 of it: 2.04 + 1.80 = 3.84 GBP, and 3.84 / 12 = 0.32 GBP.
    Why not D: Adds the full price of every pack (9.70 GBP) instead of the fraction used: 9.70 / 12 = 0.81 GBP.
    Why not E: Finds the cost of the whole batch, 2.64 GBP, and does not divide by the 12 scones.
  7. Question 7

    Answer or workingMarks
    B1
    6 kg in 1.5 kg bags needs 6 / 1.5 = 4 bags, costing 4 x 1.20 = 4.80 GBP.
    6 kg in 3 kg sacks needs 6 / 3 = 2 sacks, costing 2 x 2.25 = 4.50 GBP.
    Weekly saving = 4.80 - 4.50 = 0.30 GBP (a check: 0.80 - 0.75 = 0.05 GBP per kg, times 6 kg, is also 0.30 GBP).
    The answer is B.
    Why not A: Finds the difference in price per kg (0.80 - 0.75 = 0.05 GBP) and does not multiply by the 6 kg used.
    Why not C: Compares the 500 g bags with the 1.5 kg bags instead: 12 x 0.45 = 5.40 GBP against 4.80 GBP.
    Why not D: Compares the 500 g bags with the 3 kg sacks: 5.40 - 4.50 = 0.90 GBP. The bakery currently buys 1.5 kg bags.
    Why not E: Subtracts one pack price from the other (2.25 - 1.20 = 1.05 GBP) without allowing for the different pack sizes.
  8. Question 8

    Answer or workingMarks
    C1
    The dry ingredients in one batch are flour 450 g, sugar 75 g and sultanas 120 g, a ratio of 450 : 75 : 120 with a total of 645 g.
    The bag holds 1.29 kg = 1290 g, and 1290 / 645 = 2, so the bag is exactly two batches' worth.
    Sultanas = 120 x 2 = 240 g (check: flour 900 g + sugar 150 g + sultanas 240 g = 1290 g).
    The answer is C.
    Why not A: Copies the sultanas for one batch without scaling to the size of the bag.
    Why not B: Calculates the sugar share instead: 75 x 2 = 150 g.
    Why not D: Splits the bag equally between three ingredients, 1290 / 3 = 430 g, ignoring the ratio.
    Why not E: Calculates the flour share instead: 450 x 2 = 900 g.
  9. Question 9

    Answer or workingMarks
    A1
    With every decorator at the same rate, the number of decorators and the number of days are inversely proportional: their product stays fixed.
    The hall took 4 x 6 = 24 decorator-days of work.
    With 6 decorators: 24 / 6 = 4 days.
    The answer is A.
    Why not B: Assumes the job takes the same time whatever the size of the crew, so the number of decorators makes no difference.
    Why not C: Adds 2 days for the 2 extra decorators, treating the change as additive rather than proportional.
    Why not D: Treats days and decorators as directly proportional: 6 x 6 / 4 = 9 days, so more workers take longer.
    Why not E: Finds the total work, 4 x 6 = 24 decorator-days, and stops without dividing by the 6 decorators.
  10. Question 10

    Answer or workingMarks
    D1
    Rate from the hall: 720 m^2 x 2 coats = 1440 m^2 of coat painted in 4 x 6 = 24 decorator-days, so one decorator covers 1440 / 24 = 60 m^2 of coat per day.
    Corridor work = 360 x 2 = 720 m^2 of coat, which is 720 / 60 = 12 decorator-days.
    With 3 decorators: 12 / 3 = 4 days.
    The answer is D.
    Why not A: Leaves out the second coat: 360 / 60 = 6 decorator-days, and 6 / 3 = 2 days.
    Why not B: Halves the hall's 6 days to 3 for half the area, then scales by 3/4 for the smaller crew (3 x 3 / 4 = 2.25), treating fewer workers as faster.
    Why not C: Halves the hall's time for half the area (6 / 2 = 3 days) but forgets that the corridor has 3 decorators, not 4.
    Why not E: Finds the work as 12 decorator-days and stops without dividing by the 3 decorators.
  11. Question 11

    Answer or workingMarks
    D1
    The office needs 150 m^2 x 3 coats = 450 m^2 of coverage.
    At 12 m^2 per litre that is 450 / 12 = 37.5 litres.
    In 5-litre tins: 37.5 / 5 = 7.5 tins. Part-tins cannot be bought, so round up to 8 tins (the 38 GBP tin price is not needed).
    The answer is D.
    Why not A: Allows for one coat only: 150 / 12 = 12.5 litres, 2.5 tins, rounded up to 3.
    Why not B: Uses 2 coats, as on the other jobs, instead of the office's 3: 300 / 12 = 25 litres = 5 tins.
    Why not C: Finds 7.5 tins but rounds down; 7 tins hold 35 litres, which is less than the 37.5 litres needed.
    Why not E: Finds 37.5 litres, rounds to 38 and gives litres, not 5-litre tins.
  12. Question 12

    Answer or workingMarks
    E1
    From the hall, one decorator covers 60 m^2 of coat per day (1440 m^2 of coat in 24 decorator-days).
    The classrooms need 900 x 2 = 1800 m^2 of coat, which is 1800 / 60 = 30 decorator-days.
    To finish in 4 days needs 30 / 4 = 7.5 decorators. A part-decorator is not possible and 7 would fall short, so round up to 8.
    The answer is E.
    Why not A: Treats crew size as directly proportional to time: 5 x 4 / 6 = 3.33, rounded down to 3, so a shorter deadline needs fewer people.
    Why not B: Leaves out the second coat: 900 / 60 = 15 decorator-days, and 15 / 4 = 3.75, rounded up to 4.
    Why not C: Gives the number of days the assigned 5 decorators would take (30 / 5 = 6) instead of the number of decorators.
    Why not D: Finds 30 / 4 = 7.5 decorators but rounds down; 7 decorators manage only 28 decorator-days in 4 days.

Keep going

More free UCAT practice