UCAT Quantitative Reasoning: Ratio and proportion, set 1
Sharing in a ratio, scaling a recipe or a dose, and telling direct proportion from inverse proportion when the data does not say which. Test standard. 12 questions, 12 marks, about 9 minutes.
Download the questions (PDF) Download with worked solutions (PDF)
- Most questions come in groups of four that share one table or passage.
- Each question has exactly one correct answer from five options.
- A basic calculator is allowed in this subtest.
- 11 mark
A 4-year-old child weighs 14 kg. What volume of the oral liquid should be given as one single dose?
- 21 mark
A 9-year-old weighs 44 kg. What is the total amount of Drug X this child receives in one day when given the full number of doses?
- 31 mark
An adult aged 30 who weighs 75 kg is prescribed Drug X tablets at the full daily number of doses. A pack holds 28 tablets. For how many complete days will one pack last?
- 41 mark
A 3-year-old weighing 12 kg and a 7-year-old weighing 24 kg are each given one single dose of Drug X. What is the ratio of the 3-year-old's dose to the 7-year-old's dose, in its simplest form?
- 51 mark
The bakery receives an order for 30 scones and scales the recipe exactly. How many grams of sultanas are needed?
- 61 mark
Counting only the fraction of each pack that one batch uses, what is the ingredient cost of one scone, to the nearest penny?
- 71 mark
The bakery uses exactly 6 kg of flour a week and currently buys it in 1.5 kg bags. How much would it save each week by buying 3 kg sacks instead?
- 81 mark
The bakery sells a 1.29 kg bag of dry scone mix containing only flour, caster sugar and sultanas, in the same ratio as the recipe card. How many grams of sultanas are in the bag?
- 91 mark
If the hall had been painted by 6 decorators instead of 4, working at the same rate, how many working days would it have taken?
- 101 mark
How many working days will the corridor take with the number of decorators assigned to it?
- 111 mark
How many tins of paint must be bought for the office?
- 121 mark
The school asks for the six classrooms to be finished in 4 working days. What is the smallest number of decorators needed to do this?
Worked solutions
Each solution below shows the working. The official material for this test gives only the correct option letter.
Question 1
Answer or working Marks C 1 A 4-year-old is in the 1 to 5 years band, so the dose is 6 mg per kg: 6 x 14 = 84 mg. Check the cap: the maximum single dose for this band is 90 mg, and 84 mg is below it, so 84 mg is given. The liquid holds 40 mg in 5 ml, which is 40 / 5 = 8 mg in each ml. Volume = 84 / 8 = 10.5 ml. The answer is C. Why not A: Divides the 84 mg dose by 40 (84 / 40 = 2.1), treating the liquid as 40 mg per ml and forgetting that the 40 mg is in 5 ml. Why not B: Uses the 6 to 11 years rate of 5 mg/kg: 5 x 14 = 70 mg, and 70 / 8 = 8.75 ml. A 4-year-old is in the 1 to 5 years band. Why not D: Gives the band's maximum single dose of 90 mg (90 / 8 = 11.25 ml) even though the weight-based dose of 84 mg is below the cap. Why not E: Works out the whole day's volume, 3 doses x 84 mg = 252 mg and 252 / 8 = 31.5 ml, when the question asks for one dose. Question 2
Answer or working Marks D 1 A 9-year-old is in the 6 to 11 years band: 5 mg per kg, maximum single dose 200 mg, 3 doses per day. The weight-based dose is 5 x 44 = 220 mg, which is over the 200 mg cap, so each dose is 200 mg. Daily total = 3 x 200 = 600 mg. The answer is D. Why not A: Stops at the single dose of 200 mg and does not multiply by the 3 doses per day. Why not B: Uses the uncapped dose of 5 x 44 = 220 mg but takes 2 doses per day from the adult row: 220 x 2 = 440 mg. Why not C: Uses the 12 years and over rate of 4 mg/kg with 3 doses: 4 x 44 = 176 mg, and 176 x 3 = 528 mg. Why not E: Ignores the maximum single dose: 5 x 44 = 220 mg, and 220 x 3 = 660 mg. Each dose is capped at 200 mg. Question 3
Answer or working Marks B 1 An adult aged 30 is in the 12 years and over band: 4 mg per kg, maximum 400 mg, 2 doses per day. Single dose = 4 x 75 = 300 mg, which is under the 400 mg cap. At 100 mg per tablet that is 3 tablets per dose. Tablets per day = 3 x 2 = 6. The pack gives 28 / 6 = 4.67 days, and only complete days count (4 days use 24 tablets; a fifth day would need 30). The answer is B. Why not A: Gives the maximum single dose of 400 mg (4 tablets) instead of the weight-based 300 mg: 8 tablets a day, and 28 / 8 = 3.5, so 3 days. Why not C: Finds 28 / 6 = 4.67 correctly but rounds up to 5; the fifth day would need 30 tablets, more than the pack holds. Why not D: Counts 3 tablets per dose but only one dose per day: 28 / 3 = 9.33, so 9 days. Adults take 2 doses a day. Why not E: Treats each dose as a single tablet, so 2 tablets a day and 28 / 2 = 14 days, ignoring the dose size. Question 4
Answer or working Marks C 1 The 3-year-old is in the 1 to 5 years band: 6 x 12 = 72 mg, under the 90 mg cap. The 7-year-old is in the 6 to 11 years band: 5 x 24 = 120 mg, under the 200 mg cap. Ratio 72 : 120. Dividing both by 24 gives 3 : 5. The answer is C. Why not A: Compares the weights only, 12 : 24 = 1 : 2, as if both children took the same dose per kg. Why not B: Puts the 7-year-old in the 12 years and over band: 4 x 24 = 96 mg, and 72 : 96 = 3 : 4. Why not D: Finds the right doses, 72 mg and 120 mg, but writes the ratio the wrong way round. Why not E: Compares the dose rates per kg (6 : 5) and ignores the children's weights. Question 5
Answer or working Marks D 1 The scale factor from 12 scones to 30 scones is 30 / 12 = 2.5. Sultanas for one batch = 120 g. Sultanas for 30 scones = 120 x 2.5 = 300 g. The answer is D. Why not A: Inverts the scale factor: 120 x 12 / 30 = 48 g, which makes the larger order use less fruit. Why not B: Scales by adding instead of multiplying: 30 - 12 = 18 extra scones, so 120 + 18 = 138 g. Why not C: Doubles the recipe (120 x 2 = 240 g), which makes only 24 scones. Why not E: Trebles the recipe (120 x 3 = 360 g), which makes 36 scones, rounding the order up to whole batches when the question says scale exactly. Question 6
Answer or working Marks B 1 Cost of each ingredient = (amount used / pack size) x pack price. Flour 450/1500 x 1.20 = 0.36; butter 100/250 x 2.10 = 0.84; sugar 75/1000 x 1.60 = 0.12. Sultanas 120/500 x 2.00 = 0.48; milk 240/1000 x 1.00 = 0.24; eggs 2/6 x 1.80 = 0.60. Batch cost = 0.36 + 0.84 + 0.12 + 0.48 + 0.24 + 0.60 = 2.64 GBP. Per scone = 2.64 / 12 = 0.22 GBP. The answer is B. Why not A: Leaves out the eggs because they are counted rather than weighed: 2.64 - 0.60 = 2.04 GBP, and 2.04 / 12 = 0.17 GBP. Why not C: Charges the whole 1.80 GBP egg box instead of 2/6 of it: 2.04 + 1.80 = 3.84 GBP, and 3.84 / 12 = 0.32 GBP. Why not D: Adds the full price of every pack (9.70 GBP) instead of the fraction used: 9.70 / 12 = 0.81 GBP. Why not E: Finds the cost of the whole batch, 2.64 GBP, and does not divide by the 12 scones. Question 7
Answer or working Marks B 1 6 kg in 1.5 kg bags needs 6 / 1.5 = 4 bags, costing 4 x 1.20 = 4.80 GBP. 6 kg in 3 kg sacks needs 6 / 3 = 2 sacks, costing 2 x 2.25 = 4.50 GBP. Weekly saving = 4.80 - 4.50 = 0.30 GBP (a check: 0.80 - 0.75 = 0.05 GBP per kg, times 6 kg, is also 0.30 GBP). The answer is B. Why not A: Finds the difference in price per kg (0.80 - 0.75 = 0.05 GBP) and does not multiply by the 6 kg used. Why not C: Compares the 500 g bags with the 1.5 kg bags instead: 12 x 0.45 = 5.40 GBP against 4.80 GBP. Why not D: Compares the 500 g bags with the 3 kg sacks: 5.40 - 4.50 = 0.90 GBP. The bakery currently buys 1.5 kg bags. Why not E: Subtracts one pack price from the other (2.25 - 1.20 = 1.05 GBP) without allowing for the different pack sizes. Question 8
Answer or working Marks C 1 The dry ingredients in one batch are flour 450 g, sugar 75 g and sultanas 120 g, a ratio of 450 : 75 : 120 with a total of 645 g. The bag holds 1.29 kg = 1290 g, and 1290 / 645 = 2, so the bag is exactly two batches' worth. Sultanas = 120 x 2 = 240 g (check: flour 900 g + sugar 150 g + sultanas 240 g = 1290 g). The answer is C. Why not A: Copies the sultanas for one batch without scaling to the size of the bag. Why not B: Calculates the sugar share instead: 75 x 2 = 150 g. Why not D: Splits the bag equally between three ingredients, 1290 / 3 = 430 g, ignoring the ratio. Why not E: Calculates the flour share instead: 450 x 2 = 900 g. Question 9
Answer or working Marks A 1 With every decorator at the same rate, the number of decorators and the number of days are inversely proportional: their product stays fixed. The hall took 4 x 6 = 24 decorator-days of work. With 6 decorators: 24 / 6 = 4 days. The answer is A. Why not B: Assumes the job takes the same time whatever the size of the crew, so the number of decorators makes no difference. Why not C: Adds 2 days for the 2 extra decorators, treating the change as additive rather than proportional. Why not D: Treats days and decorators as directly proportional: 6 x 6 / 4 = 9 days, so more workers take longer. Why not E: Finds the total work, 4 x 6 = 24 decorator-days, and stops without dividing by the 6 decorators. Question 10
Answer or working Marks D 1 Rate from the hall: 720 m^2 x 2 coats = 1440 m^2 of coat painted in 4 x 6 = 24 decorator-days, so one decorator covers 1440 / 24 = 60 m^2 of coat per day. Corridor work = 360 x 2 = 720 m^2 of coat, which is 720 / 60 = 12 decorator-days. With 3 decorators: 12 / 3 = 4 days. The answer is D. Why not A: Leaves out the second coat: 360 / 60 = 6 decorator-days, and 6 / 3 = 2 days. Why not B: Halves the hall's 6 days to 3 for half the area, then scales by 3/4 for the smaller crew (3 x 3 / 4 = 2.25), treating fewer workers as faster. Why not C: Halves the hall's time for half the area (6 / 2 = 3 days) but forgets that the corridor has 3 decorators, not 4. Why not E: Finds the work as 12 decorator-days and stops without dividing by the 3 decorators. Question 11
Answer or working Marks D 1 The office needs 150 m^2 x 3 coats = 450 m^2 of coverage. At 12 m^2 per litre that is 450 / 12 = 37.5 litres. In 5-litre tins: 37.5 / 5 = 7.5 tins. Part-tins cannot be bought, so round up to 8 tins (the 38 GBP tin price is not needed). The answer is D. Why not A: Allows for one coat only: 150 / 12 = 12.5 litres, 2.5 tins, rounded up to 3. Why not B: Uses 2 coats, as on the other jobs, instead of the office's 3: 300 / 12 = 25 litres = 5 tins. Why not C: Finds 7.5 tins but rounds down; 7 tins hold 35 litres, which is less than the 37.5 litres needed. Why not E: Finds 37.5 litres, rounds to 38 and gives litres, not 5-litre tins. Question 12
Answer or working Marks E 1 From the hall, one decorator covers 60 m^2 of coat per day (1440 m^2 of coat in 24 decorator-days). The classrooms need 900 x 2 = 1800 m^2 of coat, which is 1800 / 60 = 30 decorator-days. To finish in 4 days needs 30 / 4 = 7.5 decorators. A part-decorator is not possible and 7 would fall short, so round up to 8. The answer is E. Why not A: Treats crew size as directly proportional to time: 5 x 4 / 6 = 3.33, rounded down to 3, so a shorter deadline needs fewer people. Why not B: Leaves out the second coat: 900 / 60 = 15 decorator-days, and 15 / 4 = 3.75, rounded up to 4. Why not C: Gives the number of days the assigned 5 decorators would take (30 / 5 = 6) instead of the number of decorators. Why not D: Finds 30 / 4 = 7.5 decorators but rounds down; 7 decorators manage only 28 decorator-days in 4 days.