Quality control and quality assurance - Worksheets, Questions and Revision
15 original exam-style questions - 5 pages of questions with a full mark scheme - free printable PDF.
Quality control and quality assurance revision guideMore GCSE Business practiceMock exams
This topic is chapter 12 of GCSE Business Topic Workbook 4 and chapter 5 of GCSE Business 10-Minute Tests 3.
5.4 Quality control and quality assurance
- A) Checking a finished product or a sample of output, often at the end of production, to find and remove faulty items
- B) Advertising a product's quality to customers
- C) Setting the price a product will be sold for
- D) Training new staff on how to use the till
- A) Checking only the very last finished item before it is sold
- B) A system of checks built into every stage of production, aiming to prevent faults from happening in the first place
- C) A guarantee that a product will never break
- D) A method of setting staff wages
Recommend whether Ashgrove Bakery should invest in the £330 quality assurance training programme rather than continue relying only on its current end-of-line quality control. Justify your answer using the figures and points made earlier in this pack.
Question 1
- A caoB1
- Answer: A
Question 2
- one acceptable role, e.g. the baker who mixes and prepares the doughB1
- a second acceptable role, e.g. the baker who oversees the oven/baking stage, or the member of staff who packages the finished loavesB1
- Answer: Any two, e.g. the baker preparing the dough; the baker overseeing the oven; the staff member packaging loaves.
Question 3
- one acceptable method, e.g. visually inspecting each loaf for shape, colour or damageB1
- a second acceptable method, e.g. weighing loaves to check they meet the stated weight, or taste-testing samples from each batchB1
- Answer: Any two, e.g. visual inspection; weighing to check standard size/weight; taste-testing samples.
Question 4
- B caoB1
- Answer: B
Question 5
- identifies that quality control mainly checks the finished product or output, often at the end of the process, to find faults that have already happenedB1
- identifies that quality assurance builds quality checks into every stage of the process, with all staff responsible, aiming to prevent faults happening at allB1
- draws a clear contrast between the two, e.g. quality control detects problems after they occur, while quality assurance tries to stop them occurring in the first placeB1
- Answer: Quality control mainly checks the finished output, often at the end, to catch faults that have already happened, whereas quality assurance builds checks into every stage of the process, with every worker responsible, aiming to prevent faults from occurring at all.
Question 6
- (a) 800 x 0.03 seenM1
- (a) 24 loaves caoA1
- (a) Answer: 24 loaves.
- (b) 24 x 1.10 seen (ft from part a)M1
- (b) £26.40 caoA1
- (b) Answer: £26.40.
Question 7
- (a) 800 x 0.005 seenM1
- (a) 4 loaves caoA1
- (a) Answer: 4 loaves.
- (b) 4 x 1.10 seen (ft from part a)M1
- (b) £4.40 caoA1
- (b) Answer: £4.40.
Question 8
- identifies the point, e.g. customers expect a loaf to taste and look the same way every time they buy itB1
- develops the point, e.g. an inconsistent product, or one that is sometimes faulty, damages customer trust and satisfactionB1
- links clearly to an outcome, e.g. this can lose repeat customers and lead to poor word-of-mouth or reviews, reducing future salesB1
- Answer: Customers expect a loaf to taste and look the same every time, so an inconsistent or faulty product damages trust, which can lose repeat customers and lead to poor word-of-mouth, reducing future sales.
Question 9
- 26.40 - 4.40 seen (ft from questions 6b and 7b)M1
- £22.00 caoA1
- Answer: £22.00.
Question 10
- identifies the point, e.g. quality assurance checks quality at every stage of baking, not just at the very endB1
- develops the point, e.g. this means problems (such as the wrong ingredient quantity or oven temperature) are more likely to be caught and corrected before a whole loaf is ruinedB1
- links clearly to an outcome, e.g. this is why the fault rate falls from 3% under end-of-line quality control to 0.5% under quality assurance, cutting the number of wasted loavesB1
- Answer: Quality assurance checks quality at every stage of baking, not just at the end, so problems are more likely to be caught and corrected before a loaf is ruined, which is why the fault rate falls from 3% to 0.5% and fewer loaves are wasted.
Question 11
- identifies the point, e.g. training every member of staff to check quality at their own stage costs money, such as the £330 programme in question 13B1
- develops the point, e.g. adding checks at every stage of baking can also slow each stage downB1
- links clearly to an outcome, e.g. until the training cost is covered by the savings made (question 13), quality assurance is a net cost to Ashgrove, and daily output could temporarily fall while staff adjust to the new checksB1
- Answer: Training every member of staff, such as the £330 programme in question 13, costs money, and adding checks at every stage can slow production down, so quality assurance is a net cost until the training cost is covered by the savings made, and output could temporarily fall while staff adjust.
Question 12
- 22.00 x 5 x 48 seen (ft from question 9)M1
- £5,280 caoA1
- Answer: £5,280.
Question 13
- 330 / 22 seen (ft from question 9)M1
- 15 batches caoA1
- Answer: 15 batches.
Question 14
- identifies the point, e.g. a fault is only found once a loaf has already gone through the full process, using up ingredients, labour and oven timeB1
- develops the point, e.g. all of this cost has already been spent by the time the loaf is thrown away, unlike a fault caught and fixed earlier in the processB1
- links clearly to an outcome, e.g. this makes end-of-line quality control alone a more expensive way of dealing with faults, as reflected in the higher wastage cost calculated in question 6bB1
- Answer: A fault under end-of-line quality control is only found after a loaf has gone through the full process, so all the ingredients, labour and oven time have already been spent, making it a more expensive way of dealing with faults, as reflected in the higher wastage cost in question 6b.
Question 15
- Level 1 Makes simple, undeveloped comments about the quality-approach decision, with little or no use of the pack's figures and no clear recommendation.1-3
- Level 2 Gives a developed argument for or against the quality assurance training programme, using some of the pack's figures, but does not fully weigh both sides or reach a clearly justified recommendation.4-6
- Level 3 Weighs the evidence for and against the training programme, using the wastage-saving, payback and annual-saving figures from this pack, and reaches a justified recommendation supported by that analysis.7-9
- Indicative content:
- For investing: the training only costs £330 and pays for itself after just 15 batches (question 13), which at 5 batches a week (question 12) is only 3 weeks of trading, a short payback period.
- For investing: once paid back, the approach goes on to save an estimated £5,280 every year (question 12), a recurring benefit that end-of-line quality control alone cannot match.
- Against investing: question 11 shows quality assurance has its own drawbacks, including the upfront training cost and the risk that adding checks at every stage temporarily slows production while staff adjust.
- Against investing: end-of-line quality control is simpler to run and needs no extra staff training, which may suit Ashgrove better if it cannot spare staff time for training right now.
- Judgement: given the short payback period of just 15 batches and the ongoing annual saving of £5,280, which far outweighs the one-off £330 cost and any short-term slowdown, a reasonable recommendation is that Ashgrove Bakery should invest in the quality assurance training programme.
Mark your answers
Check answers without an account. Some answers can be checked automatically; use the mark scheme to mark the rest.