Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use - Worksheets, Questions and Revision

15 original exam-style questions - 4 pages of questions with a full mark scheme - free printable PDF.

Grades 4-7

This topic is chapter 4 of GCSE Geography Topic Workbook 5 and chapter 11 of GCSE Geography 10-Minute Tests 3.

Revision Library
revisionlibrary.co.uk
GCSE · Geography

9.5 Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use

AQA 8035 · Calculators not allowed · about 35 minutes
Total Marks
Name: _______________________________    Date: ____ / ____ / ______
Answer ALL questions. Show all your working.
1
State the location of Whitelee Windfarm in the UK, giving the nearest major city and the broader region.
(Total for Question 1 is 2 marks)
2
State ONE benefit the visitor centre at Whitelee can bring to the local area beyond energy production.
(Total for Question 2 is 1 mark)
3
State ONE reason why locating Whitelee on former forestry and moorland was chosen rather than in an urban area.
(Total for Question 3 is 1 mark)
4
State the installed electrical capacity of Whitelee Windfarm and explain what is meant by 'installed capacity'.
(Total for Question 4 is 2 marks)
5
Give ONE advantage of Whitelee Windfarm for local employment in the area around Glasgow.
(Total for Question 5 is 1 mark)
6
Give ONE disadvantage of Whitelee Windfarm relating to its environmental or visual impact on Eaglesham Moor.
(Total for Question 6 is 1 mark)
7
Give ONE way in which Whitelee Windfarm contributes to sustainable energy use in Scotland or the UK.
(Total for Question 7 is 1 mark)
8
Give TWO household measures that reduce energy demand and thereby help achieve sustainable energy use, with one brief reason for each measure.
(Total for Question 8 is 2 marks)
9
Suggest ONE economic disadvantage to local land users from the creation of a large windfarm on previously used moorland or forestry.
(Total for Question 9 is 1 mark)
10
Assess how successful Whitelee Windfarm has been in providing sustainable energy for Scotland and the UK.
(Total for Question 10 is 9 marks)
11
Table 1 shows Whitelee Windfarm's annual electricity generation in GWh for five recent years. Use the table to answer the following.

Table 1, Whitelee annual generation (GWh): 2018: 980; 2019: 1,050; 2020: 920; 2021: 1,180; 2022: 1,100.
(a)State the year with the highest recorded generation and the year with the lowest recorded generation in Table 1.(1)
(b)Calculate the difference in generation between the highest and lowest years in Table 1. Give your answer in GWh.(2)
(c)Describe the overall pattern of generation shown by Table 1 across these five years.(1)
(Total for Question 11 is 4 marks)
12
Suggest ONE reason why Whitelee's electricity output is described as intermittent and explain how this affects energy reliability.
(Total for Question 12 is 1 mark)
13
Give ONE example of a mitigation or management strategy used at Whitelee Windfarm or similar sites to reduce environmental impact during construction or operation.
(Total for Question 13 is 1 mark)
14
Explain ONE limitation of relying on a single large windfarm, such as Whitelee, to meet a region's energy needs.
(Total for Question 14 is 2 marks)
15
Using the 2022 generation of 1,100 GWh and an installed capacity of 539 MW for Whitelee, calculate the capacity factor for 2022. Show your working and give your answer to one decimal place. Use hours per year = 8,760 hours. The formula is: capacity factor = (annual generation in MWh) / (installed capacity in MW x hours per year) x 100.
(Total for Question 15 is 2 marks)
Mark scheme · 9.5 Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use

Question 1

  • nearest major city: Glasgow, oeB1
  • region: on Eaglesham Moor / South Lanarkshire / near Glasgow in west central Scotland, oeB1
  • Answer: Near Glasgow on Eaglesham Moor in South Lanarkshire, west central Scotland.

Question 2

  • benefit 1: tourism income / increased visitors, oeB1
  • Answer: Tourism income and educational visits that raise public awareness of renewable energy.

Question 3

  • reason: large open area with stronger and more consistent winds, available space for turbines and lower conflict with dense population, oeB1
  • Answer: Because moorland provides large open space with stronger, more consistent winds and fewer conflicts with dense population than urban areas.

Question 4

  • installed capacity: 539 MWB1
  • explanation: the maximum electrical power the windfarm can produce at any instant when all turbines are generating at full output, oeB1
  • Answer: Installed capacity 539 MW. This is the maximum electrical power the windfarm can produce at one time when all turbines are operating at full output.

Question 5

  • creates jobs, e.g. maintenance, operations, visitor centre staff, or construction jobs during building, oeB1
  • Answer: It creates jobs, for example in turbine maintenance and operations, visitor centre staff and construction roles during installation.

Question 6

  • visual impact on landscape / intrusion into moorland views, or habitat disruption during construction, or noise concerns, oeB1
  • Answer: Visual impact on the moorland landscape, and possible habitat disruption during construction.

Question 7

  • reduces carbon emissions by generating low-carbon electricity, oeB1
  • Answer: It generates low-carbon electricity, reducing carbon emissions from the power sector.

Question 8

  • measure 1 with reason, e.g. loft insulation to reduce heat loss and lower heating demand, oeB1
  • measure 2 with reason, e.g. installing LED lighting to reduce electricity use per lumen, oeB1
  • Answer: Loft insulation to reduce heat loss and lower heating demand; LED lighting to reduce electricity use for lighting.

Question 9

  • example: loss of grazing land or forestry income, or disruption to existing local businesses during construction, oeB1
  • Answer: Loss of grazing land or forestry income for local land users, reducing their income during and after construction.

Question 10

  • Level 1 Simple statements about Whitelee with limited development. May list advantages and disadvantages with little linkage or few named facts. A partial, unsupported judgement may be present.1-3
  • Level 2 Clear assessment using specific points about Whitelee, including some named facts or figures (for example installed capacity 539 MW, annual generation figures); considers both benefits and limitations and gives a supported judgement.4-6
  • Level 3 A detailed, balanced assessment that uses accurate named facts and figures about Whitelee and links these to wider sustainable energy themes. Weighs renewable low-carbon generation, jobs and visitor benefits against intermittency, visual and habitat impacts, and the need for storage or backup. Reaches a well-justified conclusion on the extent of success, recognising trade-offs and wider system implications.7-9
  • Indicative content:
    • Successes: Whitelee is the largest onshore windfarm in the UK with installed capacity 539 MW, producing substantial annual generation (example years 2018-2022 between about 920 and 1,180 GWh), contributing low-carbon electricity and helping reduce fossil fuel use and carbon emissions for Scotland and the UK.
    • Successes: creates local jobs in operation and maintenance and supports a visitor centre that brings tourism income and education about renewables.
    • Limitations: wind is intermittent so reliability requires backup generation or energy storage; capacity factor (example 2022) around 23.3% shows it does not operate at full capacity continuously.
    • Limitations: local environmental concerns include visual impact on Eaglesham Moor, potential habitat disruption during construction, and possible noise concerns for nearby residents.
    • Wider sustainability context: Whitelee contributes to national renewable targets and energy security by diversifying supply, but on its own cannot meet demand, so integration with other renewables, storage, demand reduction and grid upgrades is necessary.
    • Evaluation: a balanced judgement might conclude Whitelee has been largely successful as a large-scale renewable generator that contributes materially to sustainable energy, while also acknowledging the need for complementary measures to manage intermittency and local environmental impacts; a supported conclusion should state the extent of success and recommend how benefits might be increased or disadvantages reduced.

Question 11

  • (a) highest: 2021; lowest: 2020B1
  • (a) Answer: Highest: 2021. Lowest: 2020.
  • (b) 1180 - 920 seen, oeM1
  • (b) 260 GWh caoA1
  • (b) Answer: 260 GWh.
  • (c) generation fluctuates year to year with no steady trend, with a low in 2020 and peaks in 2019 and 2021, oeB1
  • (c) Answer: Annual generation fluctuates: it falls to a low in 2020, rises to peaks in 2019 and especially 2021, and remains high in 2022 but below 2021.

Question 12

  • reason: wind speed varies so turbines do not produce electricity continuously, oeB1
  • Answer: Because wind speeds vary, turbines do not produce electricity continuously; this intermittency means output can drop when wind is low, so other generation or storage is needed to maintain reliability.

Question 13

  • example: habitat restoration, careful routing of access tracks, timing construction to avoid breeding seasons, or planting new woodland, oeB1
  • Answer: For example, restoring habitats and timing construction work to avoid breeding seasons to reduce wildlife disturbance.

Question 14

  • limitation stated, e.g. intermittency meaning output is variable and cannot be relied on at all times, oeB1
  • linked consequence, e.g. requires backup generation or storage, increasing overall system cost or complexity, oeB1
  • Answer: A limitation is intermittency, because output varies with wind so the region still needs backup generation or storage which increases cost and complexity.

Question 15

  • work shown: 1,100,000 MWh / (539 x 8760) or equivalent, oeM1
  • 23.3% caoA1
  • Answer: 23.3%.

Mark your answers

Check answers without an account. Some answers can be checked automatically; use the mark scheme to mark the rest.

Question 1

2 marks
Did your answer earn the marks?

Question 2

1 mark
Did your answer earn the marks?

Question 3

1 mark
Did your answer earn the marks?

Question 4

2 marks
Did your answer earn the marks?

Question 5

1 mark
Did your answer earn the marks?

Question 6

1 mark
Did your answer earn the marks?

Question 7

1 mark
Did your answer earn the marks?

Question 8

2 marks
Did your answer earn the marks?

Question 9

1 mark
Did your answer earn the marks?

Question 10

9 marks
Did your answer earn the marks?

Question 11

4 marks
Did your answer earn the marks?

Question 12

1 mark
Did your answer earn the marks?

Question 13

1 mark
Did your answer earn the marks?

Question 14

2 marks
Did your answer earn the marks?

Question 15

2 marks
Mark my answers

Worksheets are written for Revision Library and come with a full mark scheme; a few English packs quote an out-of-copyright text, and name it on the page. Exam board names and specification codes say which qualification a pack suits: we are not affiliated with, endorsed by or approved by any exam board, and no past-paper question is reproduced here. Rights queries: hello@revisionlibrary.co.uk