Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use - Worksheets, Questions and Revision
15 original exam-style questions - 4 pages of questions with a full mark scheme - free printable PDF.
Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use revision guideMore GCSE Geography practiceMock exams
This topic is chapter 4 of GCSE Geography Topic Workbook 5 and chapter 11 of GCSE Geography 10-Minute Tests 3.
9.5 Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use
Table 1, Whitelee annual generation (GWh): 2018: 980; 2019: 1,050; 2020: 920; 2021: 1,180; 2022: 1,100.
Question 1
- nearest major city: Glasgow, oeB1
- region: on Eaglesham Moor / South Lanarkshire / near Glasgow in west central Scotland, oeB1
- Answer: Near Glasgow on Eaglesham Moor in South Lanarkshire, west central Scotland.
Question 2
- benefit 1: tourism income / increased visitors, oeB1
- Answer: Tourism income and educational visits that raise public awareness of renewable energy.
Question 3
- reason: large open area with stronger and more consistent winds, available space for turbines and lower conflict with dense population, oeB1
- Answer: Because moorland provides large open space with stronger, more consistent winds and fewer conflicts with dense population than urban areas.
Question 4
- installed capacity: 539 MWB1
- explanation: the maximum electrical power the windfarm can produce at any instant when all turbines are generating at full output, oeB1
- Answer: Installed capacity 539 MW. This is the maximum electrical power the windfarm can produce at one time when all turbines are operating at full output.
Question 5
- creates jobs, e.g. maintenance, operations, visitor centre staff, or construction jobs during building, oeB1
- Answer: It creates jobs, for example in turbine maintenance and operations, visitor centre staff and construction roles during installation.
Question 6
- visual impact on landscape / intrusion into moorland views, or habitat disruption during construction, or noise concerns, oeB1
- Answer: Visual impact on the moorland landscape, and possible habitat disruption during construction.
Question 7
- reduces carbon emissions by generating low-carbon electricity, oeB1
- Answer: It generates low-carbon electricity, reducing carbon emissions from the power sector.
Question 8
- measure 1 with reason, e.g. loft insulation to reduce heat loss and lower heating demand, oeB1
- measure 2 with reason, e.g. installing LED lighting to reduce electricity use per lumen, oeB1
- Answer: Loft insulation to reduce heat loss and lower heating demand; LED lighting to reduce electricity use for lighting.
Question 9
- example: loss of grazing land or forestry income, or disruption to existing local businesses during construction, oeB1
- Answer: Loss of grazing land or forestry income for local land users, reducing their income during and after construction.
Question 10
- Level 1 Simple statements about Whitelee with limited development. May list advantages and disadvantages with little linkage or few named facts. A partial, unsupported judgement may be present.1-3
- Level 2 Clear assessment using specific points about Whitelee, including some named facts or figures (for example installed capacity 539 MW, annual generation figures); considers both benefits and limitations and gives a supported judgement.4-6
- Level 3 A detailed, balanced assessment that uses accurate named facts and figures about Whitelee and links these to wider sustainable energy themes. Weighs renewable low-carbon generation, jobs and visitor benefits against intermittency, visual and habitat impacts, and the need for storage or backup. Reaches a well-justified conclusion on the extent of success, recognising trade-offs and wider system implications.7-9
- Indicative content:
- Successes: Whitelee is the largest onshore windfarm in the UK with installed capacity 539 MW, producing substantial annual generation (example years 2018-2022 between about 920 and 1,180 GWh), contributing low-carbon electricity and helping reduce fossil fuel use and carbon emissions for Scotland and the UK.
- Successes: creates local jobs in operation and maintenance and supports a visitor centre that brings tourism income and education about renewables.
- Limitations: wind is intermittent so reliability requires backup generation or energy storage; capacity factor (example 2022) around 23.3% shows it does not operate at full capacity continuously.
- Limitations: local environmental concerns include visual impact on Eaglesham Moor, potential habitat disruption during construction, and possible noise concerns for nearby residents.
- Wider sustainability context: Whitelee contributes to national renewable targets and energy security by diversifying supply, but on its own cannot meet demand, so integration with other renewables, storage, demand reduction and grid upgrades is necessary.
- Evaluation: a balanced judgement might conclude Whitelee has been largely successful as a large-scale renewable generator that contributes materially to sustainable energy, while also acknowledging the need for complementary measures to manage intermittency and local environmental impacts; a supported conclusion should state the extent of success and recommend how benefits might be increased or disadvantages reduced.
Question 11
- (a) highest: 2021; lowest: 2020B1
- (a) Answer: Highest: 2021. Lowest: 2020.
- (b) 1180 - 920 seen, oeM1
- (b) 260 GWh caoA1
- (b) Answer: 260 GWh.
- (c) generation fluctuates year to year with no steady trend, with a low in 2020 and peaks in 2019 and 2021, oeB1
- (c) Answer: Annual generation fluctuates: it falls to a low in 2020, rises to peaks in 2019 and especially 2021, and remains high in 2022 but below 2021.
Question 12
- reason: wind speed varies so turbines do not produce electricity continuously, oeB1
- Answer: Because wind speeds vary, turbines do not produce electricity continuously; this intermittency means output can drop when wind is low, so other generation or storage is needed to maintain reliability.
Question 13
- example: habitat restoration, careful routing of access tracks, timing construction to avoid breeding seasons, or planting new woodland, oeB1
- Answer: For example, restoring habitats and timing construction work to avoid breeding seasons to reduce wildlife disturbance.
Question 14
- limitation stated, e.g. intermittency meaning output is variable and cannot be relied on at all times, oeB1
- linked consequence, e.g. requires backup generation or storage, increasing overall system cost or complexity, oeB1
- Answer: A limitation is intermittency, because output varies with wind so the region still needs backup generation or storage which increases cost and complexity.
Question 15
- work shown: 1,100,000 MWh / (539 x 8760) or equivalent, oeM1
- 23.3% caoA1
- Answer: 23.3%.
Mark your answers
Check answers without an account. Some answers can be checked automatically; use the mark scheme to mark the rest.