Revision Library
Choose a subject
Menu
Geography

GCSE Geography Topic Workbooks · Book 5 of 5

GCSE Geography Topic Workbook 5

Impacts of Energy Insecurity and Large-Scale Strategies to Increase Supply, Sustainable Energy Use and Local Renewable Schemes, Energy Security: Changing Demand and Factors Affecting Supply and 10 more

Level
GCSE · AQA 8035
Series
GCSE Geography Topic Workbooks, book 5 of 5
Suitable for
Years 10-11, AQA
FreePDF download · 2027 edition · 101 A4 pages
  • One file, prints straight to A4
  • No account, no password

Workbooks like this one, with 13 topics, 190 questions and mark schemes at the back, are usually printed and sold by publishers. This one is one of 558 free PDFs on the shelf.

Pages
101 A4 pages
Chapters
13 worksheet chapters
Questions
190 · 435 marks
Answers
From page 76
Working time
About 8h 40m

What is inside

13 chapters · answers from p76

Each chapter starts with a page showing its marks and a suggested time, followed by the questions. The mark schemes for all 13 chapters are at the back, so the book works for homework, a timed test or revision.

  1. 01Impacts of Energy Insecurity and Large-Scale Strategies to Increase Supply15 questions · 38 marks · about 45 min Topic guide: Impacts of Energy Insecurity and Large-Scale Strategies to Increase Supplyp3
  2. 02Sustainable Energy Use and Local Renewable Schemes16 questions · 44 marks · about 55 min Topic guide: Sustainable Energy Use and Local Renewable Schemesp8
  3. 03Energy Security: Changing Demand and Factors Affecting Supply9 questions · 24 marks · about 30 min Topic guide: Energy Security: Changing Demand and Factors Affecting Supplyp13
  4. 04Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use15 questions · 31 marks · about 35 min Topic guide: Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Usep17
  5. 05Ordnance Survey Map Skills: Grid References, Scale and Distance15 questions · 29 marks · about 35 min Topic guide: Ordnance Survey Map Skills: Grid References, Scale and Distancep22
  6. 06Ordnance Survey Map Skills: Relief, Contours and Cross Sections15 questions · 29 marks · about 35 min Topic guide: Ordnance Survey Map Skills: Relief, Contours and Cross Sectionsp29
  7. 07Graphical Skills: Line Graphs, Bar Charts and Pie Charts15 questions · 40 marks · about 50 min Topic guide: Graphical Skills: Line Graphs, Bar Charts and Pie Chartsp34
  8. 08Numerical Skills: Percentages, Averages and Measures of Spread16 questions · 30 marks · about 35 min Topic guide: Numerical Skills: Percentages, Averages and Measures of Spreadp40
  9. 09Fieldwork Enquiry: Planning, Sampling and Data Collection15 questions · 30 marks · about 35 min Topic guide: Fieldwork Enquiry: Planning, Sampling and Data Collectionp45
  10. 10Fieldwork Enquiry: Presenting, Analysing and Evaluating Data15 questions · 32 marks · about 40 min Topic guide: Fieldwork Enquiry: Presenting, Analysing and Evaluating Datap50
  11. 11Issue Evaluation: Interpreting Resources and Reaching a Justified Decision15 questions · 43 marks · about 50 min Topic guide: Issue Evaluation: Interpreting Resources and Reaching a Justified Decisionp55
  12. 12Graphical Skills: Population Pyramids, Triangular Graphs and Radial Graphs14 questions · 30 marks · about 35 min Topic guide: Graphical Skills: Population Pyramids, Triangular Graphs and Radial Graphsp63
  13. 13Photographic, Sketch Map and GIS Skills15 questions · 35 marks · about 40 min Topic guide: Photographic, Sketch Map and GIS Skillsp68
  14. AnswersMark schemes for every chapterp76

Each chapter is drawn from one of our worksheet packs. Follow a chapter title for the full pack on its own page, or browse every GCSE Geography pack. Every book on the shelf is a complete printable workbook of up to 120 A4 pages.

Explore this volume

GCSE Geography Topic Workbook 5 includes Impacts of Energy Insecurity and Large-Scale Strategies to Increase Supply (from page 3); Sustainable Energy Use and Local Renewable Schemes (from page 8); Energy Security: Changing Demand and Factors Affecting Supply (from page 13); Energy Security Case Study: Whitelee Windfarm and Sustainable Energy Use (from page 17); Ordnance Survey Map Skills: Grid References, Scale and Distance (from page 22); Ordnance Survey Map Skills: Relief, Contours and Cross Sections (from page 29); Graphical Skills: Line Graphs, Bar Charts and Pie Charts (from page 34); Numerical Skills: Percentages, Averages and Measures of Spread (from page 40); Fieldwork Enquiry: Planning, Sampling and Data Collection (from page 45); Fieldwork Enquiry: Presenting, Analysing and Evaluating Data (from page 50); Issue Evaluation: Interpreting Resources and Reaching a Justified Decision (from page 55); Graphical Skills: Population Pyramids, Triangular Graphs and Radial Graphs (from page 63); Photographic, Sketch Map and GIS Skills (from page 68).

Worked question 15 - Issue Evaluation: Interpreting Resources and Reaching a Justified Decision

Open the included worksheet

Resources booklet: Rivermere

Rivermere is a fictional town. All places, features and figures in this booklet are fictional and were written for Revision Library as original teaching material.

Rivermere is a fictional town on the River Cheriton. Its council must choose between two flood-management options, Option A and Option B. Use the notes, Figure 1 and Figure 2 to answer the questions in this pack. Read the whole booklet before you start the questions.

NOTES ON THE TWO OPTIONS

Option A is a diversion channel. It would be dug across the floodplain at Proposed Site A to carry flood water away from the town.

Option B is a raised bank (an embankment). It would be built along the river bank at Proposed Site B, away from the marshes, to hold flood water back from the town.

The council can choose only one option. The costs and the number of houses protected are predictions.

FIGURE 1: Map of Rivermere

North is at the top of the map. The map is described feature by feature below. Each label on the map is in bold, exactly as it is written on the map.

River Cheriton: flows from the west (left) edge of the map to the east (right) edge, through Rivermere.

Floodplain: shaded, low-lying land on both banks of the River Cheriton. It is wide in the west and narrows towards the east. All land outside the floodplain is higher ground.

Rivermere Marshes (SSSI): marshland on the floodplain, on the north bank, in the west of the map. SSSI means Site of Special Scientific Interest, a legally protected wildlife area.

Proposed Site A: on the floodplain, on the north bank, immediately east of Rivermere Marshes (SSSI) and about 2.5 km upstream (west) of the town centre. No footpath or cycle route is marked at Proposed Site A.

Proposed Site B: on the north bank at the western edge of the town, about 0.5 km upstream (west) of the town centre and about 2.5 km downstream (east) of Rivermere Marshes (SSSI).

Town centre: on the north bank, in the east of the map.

Old Mill: on higher ground about 1 km north-west of the town centre, away from the river and outside the floodplain.

Public footpath: links Proposed Site B to the town centre. It is the only footpath marked on the map.

Planned cycle route: a route along the north bank of the River Cheriton from the town centre to Proposed Site B, where it ends. It is planned and has not been built yet.

FIGURE 2: Table comparing the two flood-management options

MeasureOption AOption B
What is builtDiversion channel across the floodplain at Proposed Site ARaised bank along the river at Proposed Site B
Initial construction cost (thousand pounds)1,2001,000
Houses protected480320
Environmental impact score (1 = low impact, 10 = high impact)74
Predicted annual maintenance cost (thousand pounds per year)258
New jobs created-25
New footpaths (length in km)-1.2

A dash (-) means that no figure is given for that option.

Figure 1: Map of RivermereSchematic map (not to scale)NRivermere Marshes (SSSI)Proposed Site AProposed Site BTown centreOld MillRiver CheritonFloodplainKeyRiver CheritonFloodplainRivermere Marshes (SSSI)Old MillProposed Site AProposed Site BTown centrePublic footpathPlanned cycle route
The council must consider both community access and environmental protection. Using Figure 1 and Figure 2, explain how the two options differ in their likely effects on recreational access to the river and on wildlife habitat. Support your explanation with specific evidence from the resources booklet.

Answer and mark scheme

Question 15

CreditAnswer or working
B1point about recreational access for Option A or B, e.g. no footpath or cycle route is marked at Proposed Site A and Figure 2 gives no new footpath length for Option A, so it adds little or no recreational access; Site A is about 2.5 km from the town centre, oe
B1point about recreational access for the other option, e.g. Site B already links to a footpath and cycle route so Option B enhances community access, linked to map, oe
B1point about wildlife habitat for Option A or B, e.g. Option A on floodplain may damage marsh habitats and SSSI, linked to map and environmental impact score, oe
B1point about wildlife habitat for the other option, e.g. Option B avoids the marshes, reducing habitat damage (environmental impact score 4 v 7), with evidence, oe
  • Answer: Recreational access: Option B sits beside the existing footpath and planned cycle route in Figure 1, so it supports easy community access; Option A has no footpath or cycle route marked at Site A (about 2.5 km from the town centre) and Figure 2 gives no new footpath length for it, so it adds little recreational access. Wildlife habitat: Option A on the floodplain risks damaging the Rivermere Marshes SSSI and floodplain habitat (Table shows higher environmental impact score), whereas Option B keeps defences away from the marshes and so has a lower impact on key habitats.

Question 14 - Issue Evaluation: Interpreting Resources and Reaching a Justified Decision

Open the included worksheet

Resources booklet: Rivermere

Rivermere is a fictional town. All places, features and figures in this booklet are fictional and were written for Revision Library as original teaching material.

Rivermere is a fictional town on the River Cheriton. Its council must choose between two flood-management options, Option A and Option B. Use the notes, Figure 1 and Figure 2 to answer the questions in this pack. Read the whole booklet before you start the questions.

NOTES ON THE TWO OPTIONS

Option A is a diversion channel. It would be dug across the floodplain at Proposed Site A to carry flood water away from the town.

Option B is a raised bank (an embankment). It would be built along the river bank at Proposed Site B, away from the marshes, to hold flood water back from the town.

The council can choose only one option. The costs and the number of houses protected are predictions.

FIGURE 1: Map of Rivermere

North is at the top of the map. The map is described feature by feature below. Each label on the map is in bold, exactly as it is written on the map.

River Cheriton: flows from the west (left) edge of the map to the east (right) edge, through Rivermere.

Floodplain: shaded, low-lying land on both banks of the River Cheriton. It is wide in the west and narrows towards the east. All land outside the floodplain is higher ground.

Rivermere Marshes (SSSI): marshland on the floodplain, on the north bank, in the west of the map. SSSI means Site of Special Scientific Interest, a legally protected wildlife area.

Proposed Site A: on the floodplain, on the north bank, immediately east of Rivermere Marshes (SSSI) and about 2.5 km upstream (west) of the town centre. No footpath or cycle route is marked at Proposed Site A.

Proposed Site B: on the north bank at the western edge of the town, about 0.5 km upstream (west) of the town centre and about 2.5 km downstream (east) of Rivermere Marshes (SSSI).

Town centre: on the north bank, in the east of the map.

Old Mill: on higher ground about 1 km north-west of the town centre, away from the river and outside the floodplain.

Public footpath: links Proposed Site B to the town centre. It is the only footpath marked on the map.

Planned cycle route: a route along the north bank of the River Cheriton from the town centre to Proposed Site B, where it ends. It is planned and has not been built yet.

FIGURE 2: Table comparing the two flood-management options

MeasureOption AOption B
What is builtDiversion channel across the floodplain at Proposed Site ARaised bank along the river at Proposed Site B
Initial construction cost (thousand pounds)1,2001,000
Houses protected480320
Environmental impact score (1 = low impact, 10 = high impact)74
Predicted annual maintenance cost (thousand pounds per year)258
New jobs created-25
New footpaths (length in km)-1.2

A dash (-) means that no figure is given for that option.

Figure 1: Map of RivermereSchematic map (not to scale)NRivermere Marshes (SSSI)Proposed Site AProposed Site BTown centreOld MillRiver CheritonFloodplainKeyRiver CheritonFloodplainRivermere Marshes (SSSI)Old MillProposed Site AProposed Site BTown centrePublic footpathPlanned cycle route
Using the map and Table, explain ONE environmental advantage of choosing Option B (the raised bank away from the marshes) and ONE economic disadvantage of Option B. Use evidence from the resources booklet to support your points.

Answer and mark scheme

Question 14

CreditAnswer or working
B1environmental advantage, e.g. less disturbance to the Rivermere Marshes SSSI or floodplain habitats, linked to map location of marshes, oe
B1economic disadvantage, e.g. Option B protects fewer houses (320) so cost per house is higher or less overall protection, linked to Table figures, oe
B1explicit use of evidence from the resources to support both points, oe
  • Answer: Environmental advantage: Option B keeps defences away from the Rivermere Marshes SSSI on the floodplain, so it causes less damage to sensitive habitats. Economic disadvantage: Option B protects fewer houses (320), raising the cost per house and giving less overall protection compared with Option A (evidence from the Table).

Question 12 - Issue Evaluation: Interpreting Resources and Reaching a Justified Decision

Open the included worksheet

Resources booklet: Rivermere

Rivermere is a fictional town. All places, features and figures in this booklet are fictional and were written for Revision Library as original teaching material.

Rivermere is a fictional town on the River Cheriton. Its council must choose between two flood-management options, Option A and Option B. Use the notes, Figure 1 and Figure 2 to answer the questions in this pack. Read the whole booklet before you start the questions.

NOTES ON THE TWO OPTIONS

Option A is a diversion channel. It would be dug across the floodplain at Proposed Site A to carry flood water away from the town.

Option B is a raised bank (an embankment). It would be built along the river bank at Proposed Site B, away from the marshes, to hold flood water back from the town.

The council can choose only one option. The costs and the number of houses protected are predictions.

FIGURE 1: Map of Rivermere

North is at the top of the map. The map is described feature by feature below. Each label on the map is in bold, exactly as it is written on the map.

River Cheriton: flows from the west (left) edge of the map to the east (right) edge, through Rivermere.

Floodplain: shaded, low-lying land on both banks of the River Cheriton. It is wide in the west and narrows towards the east. All land outside the floodplain is higher ground.

Rivermere Marshes (SSSI): marshland on the floodplain, on the north bank, in the west of the map. SSSI means Site of Special Scientific Interest, a legally protected wildlife area.

Proposed Site A: on the floodplain, on the north bank, immediately east of Rivermere Marshes (SSSI) and about 2.5 km upstream (west) of the town centre. No footpath or cycle route is marked at Proposed Site A.

Proposed Site B: on the north bank at the western edge of the town, about 0.5 km upstream (west) of the town centre and about 2.5 km downstream (east) of Rivermere Marshes (SSSI).

Town centre: on the north bank, in the east of the map.

Old Mill: on higher ground about 1 km north-west of the town centre, away from the river and outside the floodplain.

Public footpath: links Proposed Site B to the town centre. It is the only footpath marked on the map.

Planned cycle route: a route along the north bank of the River Cheriton from the town centre to Proposed Site B, where it ends. It is planned and has not been built yet.

FIGURE 2: Table comparing the two flood-management options

MeasureOption AOption B
What is builtDiversion channel across the floodplain at Proposed Site ARaised bank along the river at Proposed Site B
Initial construction cost (thousand pounds)1,2001,000
Houses protected480320
Environmental impact score (1 = low impact, 10 = high impact)74
Predicted annual maintenance cost (thousand pounds per year)258
New jobs created-25
New footpaths (length in km)-1.2

A dash (-) means that no figure is given for that option.

Figure 1: Map of RivermereSchematic map (not to scale)NRivermere Marshes (SSSI)Proposed Site AProposed Site BTown centreOld MillRiver CheritonFloodplainKeyRiver CheritonFloodplainRivermere Marshes (SSSI)Old MillProposed Site AProposed Site BTown centrePublic footpathPlanned cycle route
Using the resources booklet, suggest TWO reasons why the town council might choose Option B despite it protecting fewer houses than Option A. Use evidence from the map or Table.

Answer and mark scheme

Question 12

CreditAnswer or working
B1reason 1, any one of the reasons below, supported by a Figure 1 or Figure 2 fact: lower environmental impact score (4 v 7) / away from Rivermere Marshes (SSSI); lower initial cost (1,000 v 1,200 thousand pounds); lower annual maintenance (8 v 25 thousand pounds a year); 25 new jobs; 1.2 km of new footpaths; links to the public footpath / planned cycle route, oe
B1reason 2, a different reason from the list in the line above, supported by a Figure 1 or Figure 2 fact, oe
  • Answer: Because Option B has a lower environmental impact score and avoids harming the Rivermere Marshes SSSI, and because it has lower annual maintenance costs (£8k vs £25k), reducing long-term spending.

GCSE Geography Topic Workbooks runs to 5 volumes

Book 5 of 5 · 513 pages in the set

Each book is a separate free PDF.

Volume 1

98 pp · 151 Qs

Natural Hazards and Hazard Risk, Weather Hazards, Climate Change and 9 more

Volume 2

116 pp · 214 Qs

Tropical Rainforests: Causes and Impacts of Deforestation, Tropical Rainforests: Sustainable Management Strategies, Hot Desert Characteristics, Adaptations and Opportunities for Development and 13 more

Volume 3

98 pp · 176 Qs

Urban Regeneration and Rebranding in Bristol, Urban Sustainability and Reducing Cities' Environmental Impact, Urban Issues: A City in a Newly Emerging Economy (NEE) Case Study and 10 more

Volume 4

100 pp · 185 Qs

Impacts of Food Insecurity: Drought and Famine in the Horn of Africa, UK Food Security: Agribusiness, Food Miles and Sustainable Choices, Food Security: Rising Demand and Factors Affecting Supply and 11 more

Volume 5 · this book

101 pp · 190 Qs

Impacts of Energy Insecurity and Large-Scale Strategies to Increase Supply, Sustainable Energy Use and Local Renewable Schemes, Energy Security: Changing Demand and Factors Affecting Supply and 10 more

More GCSE books

GCSE Geography Essentials 1

33 topics · 268 Qs

The challenge of natural hazards, The living world, Physical landscapes in the UK, Urban issues and challenges, The changing economic world, The challenge of resource management

Want a different mix of topics?

Sitting an exam soon? Build a GCSE Geography mock paper or print a ready-made one.