Lean Production: Just-in-Time, Kaizen and Time-Based Management - Worksheets, Questions and Revision

15 original exam-style questions - 2 pages of questions with a full mark scheme - free printable PDF.

Download PDFJump to mark scheme (page 3)
« Previous: Ratio Analysis: Liquidity, Efficiency and Gearing RatiosNext: Quality Management: Total Quality Management and Cost of Quality »
Revision Library
revisionlibrary.co.uk
A-Level · Operations

BUS.AL22 Lean Production: Just-in-Time, Kaizen and Time-Based Management

AQA 7132 · Calculators not allowed · about 75 minutes
Total Marks
Name: _______________________________    Date: ____ / ____ / ______
Answer ALL questions in the spaces provided. Show working for calculations. Full sentences are required for extended answers (questions 11 and 12). GreenTech Bikes, used throughout this pack, is a fictional UK business.
1
Match the lean production terms to their definitions for GreenTech Bikes, a UK maker of electric bicycles. Choose the correct letter for all four terms.
Terms: 1 Just-in-time (JIT); 2 Kaizen; 3 Kanban; 4 Time-based management.
Definitions: A A visual signalling system used on the shop floor to trigger the movement or production of parts. B Continuous small improvements by employees across the business. C Reducing the time from product design to customer delivery. D Ordering or producing inventory so it arrives only when it is needed for production.
(Total for Question 1 is 1 mark)
2
State two operational benefits to GreenTech Bikes of using JIT stock control on its assembly line.
(Total for Question 2 is 2 marks)
3
Identify one risk to GreenTech Bikes of operating with very low inventory under a JIT system.
(Total for Question 3 is 1 mark)
4
State two features of kaizen as it might be practised at a small manufacturer such as GreenTech Bikes.
(Total for Question 4 is 2 marks)
5
GreenTech Bikes wants to reduce the time from prototype to customer delivery. Identify one example of a time-based management technique the business might use.
(Total for Question 5 is 1 mark)
6
Explain one operational benefit to GreenTech Bikes of using kanban cards on its production line.
(Total for Question 6 is 3 marks)
7
Identify one way GreenTech Bikes could reduce the risk of supply chain disruption while still operating JIT.
(Total for Question 7 is 1 mark)
8
Explain one benefit of kaizen for GreenTech Bikes. Give a developed answer that refers to the business context.
(Total for Question 8 is 6 marks)
9
Explain one drawback of adopting JIT for GreenTech Bikes. Give a developed answer that refers to the business context.
(Total for Question 9 is 6 marks)
10
GreenTech Bikes currently holds an average of 150,000 pounds of inventory on the balance sheet. Management estimates that adopting JIT would reduce average inventory by 40 percent. Calculate the new average inventory value and the reduction in pounds sterling. Show your working.
(Total for Question 10 is 4 marks)
11
Analyse the likely operational impact of introducing JIT at GreenTech Bikes, a manufacturer of electric bicycles that currently sources some parts from overseas and has seasonal demand peaks. Use the information in this pack in your answer.
(Total for Question 11 is 8 marks)
12
Evaluate whether GreenTech Bikes should adopt lean production across its operations, considering JIT, kaizen and time-based management, and using evidence from this pack. Reach a justified conclusion.
(Total for Question 12 is 12 marks)
13
State two operational benefits GreenTech Bikes could gain from time-based management, such as reducing time to market or using mass customisation.
(Total for Question 13 is 2 marks)
14
Identify one example of a kanban signal GreenTech Bikes could use on its assembly line.
(Total for Question 14 is 1 mark)
15
Explain one way time-based management supports mass customisation at GreenTech Bikes. Give a developed answer.
(Total for Question 15 is 3 marks)
Mark scheme · BUS.AL22 Lean Production: Just-in-Time, Kaizen and Time-Based Management

Question 1

Question 2

Question 3

Question 4

Question 5

Question 6

Question 7

Question 8

Question 9

Question 10

Question 11

Question 12

Question 13

Question 14

Question 15