Revision Library
Choose a subject
Menu

GCSE Statistics Higher Topic Workbooks · Book 5 of 8

GCSE Statistics Higher Topic Workbook 5

Quality Assurance and Control Charts, Percentiles and Interpercentile Range, Skewness and 5 more

Level
GCSE Higher · Edexcel 1ST0
Series
GCSE Statistics Higher Topic Workbooks, book 5 of 8
Suitable for
Years 10-11, Edexcel
FreePDF download · 2027 edition · 109 A4 pages
  • One file, prints straight to A4
  • No account, no password

Workbooks like this one, with 8 topics, 94 questions and mark schemes at the back, are usually printed and sold by publishers. This one is one of 558 free PDFs on the shelf.

Pages
109 A4 pages
Chapters
8 worksheet chapters
Questions
94 · 536 marks
Answers
From page 94
Working time
About 9h 20m

What is inside

8 chapters · answers from p94

Each chapter starts with a page showing its marks and a suggested time, followed by the questions. The mark schemes for all 8 chapters are at the back, so the book works for homework, a timed test or revision.

  1. 01Quality Assurance and Control Charts11 questions · 62 marks · about 65 min Topic guide: Quality Assurance and Control Chartsp3
  2. 02Percentiles and Interpercentile Range11 questions · 75 marks · about 80 min Topic guide: Percentiles and Interpercentile Rangep13
  3. 03Skewness12 questions · 69 marks · about 70 min Topic guide: Skewnessp25
  4. 04Weighted and Geometric Mean11 questions · 65 marks · about 70 min Topic guide: Weighted and Geometric Meanp36
  5. 05Mean Median Mode and Range12 questions · 61 marks · about 65 min Topic guide: Mean Median Mode and Rangep47
  6. 06Averages from a Frequency Table11 questions · 63 marks · about 65 min Topic guide: Averages from a Frequency Tablep56
  7. 07Estimated Mean from Grouped Data12 questions · 59 marks · about 60 min Topic guide: Estimated Mean from Grouped Datap66
  8. 08Comparing Data Sets14 questions · 82 marks · about 85 min Topic guide: Comparing Data Setsp79
  9. AnswersMark schemes for every chapterp94

Each chapter is drawn from one of our worksheet packs. Follow a chapter title for the full pack on its own page, or browse every GCSE Statistics pack. Every book on the shelf is a complete printable workbook of up to 120 A4 pages.

Explore this volume

GCSE Statistics Higher Topic Workbook 5 includes Quality Assurance and Control Charts (from page 3); Percentiles and Interpercentile Range (from page 13); Skewness (from page 25); Weighted and Geometric Mean (from page 36); Mean Median Mode and Range (from page 47); Averages from a Frequency Table (from page 56); Estimated Mean from Grouped Data (from page 66); Comparing Data Sets (from page 79).

Worked question 10 - Quality Assurance and Control Charts

Open the included worksheet

A factory tests the lifetime, in hours, of a sample of light bulbs taken from its production line each day. The process has a target mean lifetime of 1200 hours, with a process standard deviation of 30 hours. Samples of 9 bulbs are tested each day.

On one day, the 9 bulbs tested had these lifetimes, in hours:

1185, 1190, 1200, 1195, 1215, 1180, 1205, 1210, 1175
(a)Work out the mean lifetime of this sample of 9 bulbs.(2)
(b)Work out the standard error of the sample mean.(2)
(c)Work out the warning limits and the action limits for this control chart.(2)
(d)State, with a reason, whether the sample mean from part (a) would trigger any action on the control chart.(2)
(e)The factory's contract states that a day's batch of bulbs can only be shipped if no more than 1% of a random acceptance sample of 200 bulbs from that batch has a lifetime below 1150 hours. In a sample of 200 bulbs taken from this day's batch, 3 bulbs had a lifetime below 1150 hours. Determine, with justification, whether this day's batch should be shipped, and give one reason why passing this acceptance sample does not guarantee that every individual bulb in the batch lasts at least 1150 hours.(3)

Answer and mark scheme

Question 10

CreditAnswer or working
M1(a) 1185+1190+1200+1195+1215+1180+1205+1210+1175 (= 10755), oe
A1(a) 1195 (hours) cao
M1(b) 30/√9, oe
A1(b) 10 (hours) cao
B1(c) warning limits 1180 hours and 1220 hours, ft their SE from (b)
B1(c) action limits 1170 hours and 1230 hours, ft their SE from (b)
B1(d) no action needed / process in control, ft their limits from (c)
B1(d) because 1195 hours lies within the warning limits (1180 to 1220 hours), oe, ft
M1(e) 3/200 (= 0.015 = 1.5%), oe
A1(e) 1.5% is more than the allowed 1%, so the batch should NOT be shipped, ft
B1(e) acceptance sampling only tests a sample, not every bulb, so some untested bulbs in the batch could still last less than 1150 hours even though the sample result is known, oe
  • (a) Answer: 1195 hours
  • (b) Answer: 10 hours
  • (c) Answer: Warning limits: 1180 and 1220 hours. Action limits: 1170 and 1230 hours.
  • (d) Answer: No action needed; 1195 hours is within the warning limits.
  • (e) Answer: 3/200 = 1.5%, which is more than the allowed 1%, so the batch should not be shipped. Since only a sample (not every bulb) is tested, some untested bulbs could still last under 1150 hours.

Question 4 - Quality Assurance and Control Charts

Open the included worksheet

A machine fills bags of sugar. The target mean weight is 500 g, and the standard error of the sample mean has been calculated as 3 g. Samples of 4 bags are weighed every hour. The control chart shows the mean weight, in grams, of each of the first 12 samples taken.
488491494497500503506509512 MeanWarnWarnActionAction 123456789101112 Sample number Sample mean weight (g)
(a)Work out the warning limits for this control chart.(1)
(b)Work out the action limits for this control chart.(1)
(c)Write down the mean weight of sample 5.(1)
(d)Write down the number of the sample whose mean weight lies beyond an action limit.(1)
(e)State the action that should be taken as a result of the point identified in part (d).(2)
(f)The mean weight of sample 8 is 507 g, which lies beyond the warning limit but not beyond the action limit. Explain how the action taken for sample 8 should differ from the action taken for sample 12.(3)

Answer and mark scheme

Question 4

CreditAnswer or working
B1(a) 494 g and 506 g cao
B1(b) 491 g and 509 g cao
B1(c) 505 (g) cao
B1(d) 12 cao
B1(e) stop the filling process immediately, oe
B1(e) investigate the cause and adjust/recalibrate the machine before restarting production, oe
B1(f) for sample 8, the process is not stopped and the machine keeps running, oe
B1(f) instead, another sample is taken straight away (or the process is monitored closely), since a single point just beyond a warning limit could still be due to chance, oe
B1(f) whereas sample 12 lies beyond the action limit, which is much less likely to be due to chance alone, so it requires immediate stopping and correction (unlike sample 8), oe
  • (a) Answer: 494 g and 506 g
  • (b) Answer: 491 g and 509 g
  • (c) Answer: 505 g
  • (d) Answer: Sample 12
  • (e) Answer: Stop the process immediately; investigate and correct the machine before restarting.
  • (f) Answer: Sample 8 (warning-limit breach only): keep the process running but take another sample immediately to check. Sample 12 (action-limit breach): stop the process immediately, since this is very unlikely to be due to chance alone.

Question 5 - Quality Assurance and Control Charts

Open the included worksheet

A soup factory uses two separate quality-control methods.

Method 1: During production, a control chart plots the mean weight of samples of 5 tins, taken every 30 minutes.

Method 2: After a batch of 2000 tins has been produced, a random sample of 40 tins is tested against a tolerance (specification) limit of 400 g ± 8 g. If more than 2 tins in the sample fall outside this tolerance, the whole batch is rejected.
(a)State the name usually given to the second quality-control method described above (Method 2).(1)
(b)Give two ways in which acceptance sampling of the finished batch (Method 2) is different from monitoring the process with a control chart (Method 1).(2)
(c)In a sample of 40 tins tested from one batch, 3 tins are found to weigh outside the tolerance limits of 400 g ± 8 g. Using the factory's rule, state with a reason whether this batch should be accepted or rejected.(2)

Answer and mark scheme

Question 5

CreditAnswer or working
B1(a) acceptance sampling cao
B1(b) acceptance sampling checks a sample of finished/completed tins after production and compares them with a fixed tolerance (specification) limit, to decide whether to accept or reject the whole batch, oe
B1(b) a control chart monitors the process continuously while it is running, comparing sample means with warning/action limits based on the process's own variation, to decide whether the process itself needs adjusting, oe
M1(c) comparing 3 with the factory's threshold of 2
A1(c) rejected, because 3 is more than the 2 tins allowed outside tolerance
  • (a) Answer: Acceptance sampling
  • (b) Answer: Acceptance sampling tests finished tins against a fixed tolerance limit to accept or reject the whole batch; a control chart monitors sample means continuously during production, using limits based on the process's own variation, to decide whether the process needs adjusting.
  • (c) Answer: Rejected - 3 tins is more than the 2 allowed outside tolerance.

Question 8 - Percentiles and Interpercentile Range

Open the included worksheet

100 Under-40 runners and 100 Over-40 runners entered a charity 10 km road race. The cumulative frequency graph shows their finishing times, t minutes.
0 20 40 60 80 100 40 50 60 70 80 90 Under-40 runners Over-40 runners Race time, t (minutes) Cumulative frequency
(a)Using the graph, estimate the 10th and 90th percentiles of the Under-40 runners' finishing times, and hence their 10-90 interpercentile range.(3)
(b)Using the graph, estimate the 10th and 90th percentiles of the Over-40 runners' finishing times, and hence their 10-90 interpercentile range.(3)
(c)Compare the finishing times of the two groups, using your answers to (a) and (b).(3)

Answer and mark scheme

Question 8

CreditAnswer or working
M1(a) P10 = 45 (accept 44 - 46) minutes
M1(a) P90 = 70 minutes (read directly from the curve)
A1(a) interdecile range = 25 minutes, ft
M1(b) P10 = 50 minutes (read directly from the curve)
M1(b) P90 = 77.5 (accept 76 - 79) minutes
A1(b) interdecile range = 27.5 minutes, ft (accept 26 - 29)
B1(c) the Over-40 group has both a higher P10 (50 vs 45) and a higher P90 (77.5 vs 70), so Over-40 runners generally took longer to finish than Under-40 runners (oe)
B1(c) the Over-40 group has a slightly larger interdecile range (27.5 min) than the Under-40 group (25 min)
B1(c) so finishing times were slightly more variable/spread out among the Over-40 group than the Under-40 group (oe)
  • (a) Answer: P10 = 45 min, P90 = 70 min, interdecile range = 25 min
  • (b) Answer: P10 = 50 min, P90 = 77.5 min, interdecile range = 27.5 min
  • (c) Answer: Over-40 runners typically took longer to finish (higher P10 and P90) and had slightly more variable times (larger interdecile range: 27.5 min vs 25 min) than Under-40 runners.

Question 3 - Percentiles and Interpercentile Range

Open the included worksheet

A researcher is investigating the spread of annual income among self-employed workers in a region. Incomes in this population are known to be positively skewed, with a small number of very high earners.
(a)PLAN: Suggest a suitable statistical measure of spread for summarising this data, other than the range, and give a reason for your choice.(2)
(b)COLLECT AND PROCESS: The researcher takes a random sample of 250 self-employed workers and processes the incomes into a grouped frequency table with a cumulative frequency column. Explain why linear interpolation is needed to estimate a percentile from this table, rather than reading off an individual data value.(2)
(c)INTERPRET: The researcher estimates the 10th percentile of incomes to be £14,500 and the 90th percentile to be £68,000. Calculate the 10-90 interpercentile range, and interpret this value in context.(2)

Answer and mark scheme

Question 3

CreditAnswer or working
B1(a) the (10-90) interpercentile range, or the interquartile range (oe)
B1(a) because the distribution is skewed with some very high earners (potential outliers), and this measure ignores the extreme tails, so it is not distorted by them (oe)
B1(b) the incomes have been grouped into class intervals, so the exact individual values within each class are no longer known (oe)
B1(b) linear interpolation estimates where a percentile falls within its class by assuming the data are evenly spread across that class (oe)
B1(c) interdecile range = 68000 - 14500 = 53500
B1(c) the middle 80% of self-employed workers in the sample earn between £14,500 and £68,000 (a spread of £53,500), ignoring the lowest and highest 10% of earners (oe)
  • (a) Answer: The 10-90 interpercentile range (or IQR), because it ignores the most extreme incomes at each end, so it is not distorted by the small number of very high earners.
  • (b) Answer: Because the data are grouped, individual incomes within each class are unknown; linear interpolation estimates the percentile's position by assuming the incomes are evenly spread across the class.
  • (c) Answer: £53,500 - the middle 80% of self-employed workers earn between £14,500 and £68,000.

GCSE Statistics Higher Topic Workbooks runs to 8 volumes

Book 5 of 8 · 825 pages in the set

Each book is a separate free PDF.

Volume 1

99 pp · 104 Qs

Stratified Sampling (Higher), Capture Recapture, Estimating from Samples (Higher) and 4 more

Volume 2

103 pp · 101 Qs

Collecting Data, Designing Questionnaires and Surveys, Experimental Design and 5 more

Volume 3

102 pp · 84 Qs

Recognising Misleading Graphs (Higher), Frequency Tables and Tally Charts, Grouped Frequency Tables and 4 more

Volume 4

109 pp · 101 Qs

Histograms, Frequency Polygons, Cumulative Frequency and 5 more

Volume 5 · this book

109 pp · 94 Qs

Quality Assurance and Control Charts, Percentiles and Interpercentile Range, Skewness and 5 more

Volume 6

99 pp · 86 Qs

Combined Mean, Median Quartiles and IQR, Correlation and Causation (Higher) and 4 more

Volume 7

107 pp · 98 Qs

Time Series, Risk (Higher), Conditional Probability (Higher) and 5 more

Volume 8

97 pp · 84 Qs

Venn Diagrams, Tree Diagrams, Crude and Standardised Rates and 4 more

More GCSE Higher books

Want a different mix of topics?

Sitting an exam soon? Build a GCSE Statistics mock paper or print a ready-made one.